Rev Page Page 1 of 7 KQKS KEJURUTERAAN QKS SDN BHD 0 DOC NO : KQKS/Site_Com-P-01 TANJUNG LANGSAT PORT SDN BHD TANK COMMISSIONING PROCEDURE THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING (EPCC) OF GASOLINE TANKS (RECONSTRUCTION) FOR TANJUNG LANGSAT PORT OIL TERMINAL JOB NO: JN0901 DATE 11-05-2010 DOC NO KQKS/Site_Com-P-01 DESCRIPTION Tank Commissioning Procedure REV 0 P’PD YWL C’KD SKE REVIEW / APPROVAL TLP/TPM/RNZ Rev Page Page 2 of 7 KQKS KEJURUTERAAN QKS
Transcripts
   Rev Page0 Page 1 of 7 KQKS KEJURUTERAAN QKS SDN BHD   DOC NO :KQKS/Site_Com-P-01 TANJUNG LANGSAT PORT SDN BHD TANK COMMISSIONING PROCEDURE   THE ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING(EPCC) OF GASOLINE TANKS (RECONSTRUCTION) FORTANJUNG LANGSAT PORT OIL TERMINALJOB NO: JN0901  DATE DOC NO DESCRIPTION REV P’PD C’KDREVIEW /APPROVAL 11-05-2010 KQKS/Site_Com-P-01Tank CommissioningProcedure0 YWL SKE TLP/TPM/RNZ   Rev Page0 Page 2 of 7 KQKS KEJURUTERAAN QKS SDN BHD   DOC NO :KQKS/Site_Com-P-01 CONTENTS 1 OBJECTIVE2 SCOPE3 DEFINITION4 PROCESS DATA5 CALIBRATION CABLE6 SAFE WORKING LEVEL7 GAUGING AND DIPPING8 CHECK VALVE POSITION9 ON RECEIPT OF PRODUCT10 CONTROL DOCUMENT11 DRAINING PROCEDURE12 FIGURE 111 TANK   HEIGHT   VS   VOLUME112 PRODUCT RECEIVING SEQUENCE     Rev Page0 Page 3 of 7 KQKS KEJURUTERAAN QKS SDN BHD   DOC NO :KQKS/Site_Com-P-01 1 OBJECTIVE The purpose of this procedure is to define and guide terminal personal in commissioning oftwo (2) units of reconstructed tank T-1100A T-1100B at Tanjung Langsat Port OilTerminal, Pasir Gudang, Johor Darul Takzim 2 SCOPE The following procedure are a guide only, they may not be applicable or practical at allterminal, the owner together with project manager and project consultant should ensurethe specific procedure, to satisfy quality and quantity control and local requirement, areestablished and complied with 3 DEFINITION • Owner: Tanjung Langsat Port SdnBhd (TLP) • Project Manager: TPM Technopark SdnBhd (TPM) • Project Consultant: RNZ Integrated (M) SdnBhd(RNZ) • EPCC Contractor: Kejuruteraan QKS SdnBhd (KQKS) 4 PROCESS DATA • Tank Diameter: 374 meter • Tank Height: 2012 meter   • Receiving Product: Gasoline   • Density: 07871 15 o C   • Design Tank Pressure: 20 mbarg 6 mbarg (Vacuum)   • Design Tank Temperature: 65 o C   • Maximum Liquid Flow Rate (Receiving): 2,000 m3/hr • Maximum tank volume: 20,290 m3   • Maximum tank filling height: 1847 m  